Cut and cover tunnels

Ramboll’s cut and cover tunnelling design techniques have been developed using proven engineering expertise and our wide range of related in-house skills. We were the first to design Danish cut and cover tunnels in accordance with EU Directive 2004/54/EC on road tunnel safety.

Nordhavnsvej – Copenhagen Municipality

Contact

Stephen Whitham

Stephen Whitham

Global Division Unit Manager, Tunnels
T: +45 51615202

Rasmus Walter

Market Director, Transport
T: +45 5161 6643

During the construction process for a cut and cover tunnel, a trench is excavated, has an in-situ cast concrete structure placed in it, then is covered with an overhead support system that is strong enough to carry the load of whatever is to be built above the tunnel. The cut and cover model is used most often in the construction of shallow tunnels, or the large spaces found in modern underground metro stations.
 
Cut and cover tunnels are examples of projects which benefit from Ramboll's broad pool of expertise and draw in many related skills (e.g. Ground Engineering).
 
The Marselis Tunnel in Aarhus and the Nordhavnsvej tunnel in Copenhagen are the first Danish cut and cover tunnels to be designed in accordance with EU Directive 2004/54/EC on road tunnel safety.

More information on cut and cover tunnels

Tunnel Engineering brochure


Tunnel Engineering brochure (PDF, 1 MB)

Projects

Nordhavnsvej – Copenhagen Municipality

Nordhavnsvej – the largest road construction project in Copenhagen in 50 years

The project for “Nordhavnsvej” is the first stage of a new road to Copenhagen’s Nordhavn (North Harbour). Nordhavn is an old industrial and port area, planned to be developed into a new urban area in the north-eastern part of Copenhagen. When fully developed, the urban area is planned for 40,000 residents and 40,000 workplaces.

DIFC - Truck and Services Tunnel

A unique tunnel project for Dubai allowing easy access to the heart of DIFC

Norra Länken

To reduce congestion and to minimise the heavy traffic in the centre of Stockholm, it was decided to build the Norra länken: a five kilometre road around part of the centre of Stockholm, three kilometres of which will be in tunnels.

Marselis Aarhus

Tunnel under Marselis Boulevard

The project consists of a 1.8 kilometre cut and cover tunnel, consisting of mechanical and electrical  installations, several road and railway bridges (including railway bridges at Langenæs, Åhavevej and Viby Ringgade), and all temporary structures.

Show more projects for this service

Ramboll

Ramboll
240 Blackfriars Road
London SE1 8NW
United Kingdom
Tel: +44 20 7631 5291
Fax +44 845 299 1610

Mail: london@ramboll.co.uk

Company registration

Company registration

Ramboll UK Limited. Registered in England & Wales. Company registration no. 03659970. Registered office: 240 Blackfriars Road, London SE1 8NW


Other sites

Other sites